Forseen Maintenance
Unavailability Time Period: 28.12.2015 17:00 to 04.01.2016 08:00
Affected Market Area
10YDE-RWENET---I
Affected Capacity
Capacity Change (MW): 49
Minute | 1 | 931 | 1441 | 2371 | 2881 |
---|---|---|---|---|---|
MW | 49 | 0 | 49 | 0 | 49 |
Gas Fired Power Station Darmstadt
11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)
Frankfurter Straße 110
64293
Darmstadt