Forseen Maintenance
Unavailability Time Period: 18.12.2015 16:00 to 23.12.2015 08:30
Affected Market Area
10YDE-RWENET---I
Affected Capacity
Capacity Change (MW): 49
Minute | 1 | 3871 | 4321 | 5311 | 5761 |
---|---|---|---|---|---|
MW | 49 | 0 | 49 | 0 | 49 |
Gas Fired Power Station Darmstadt
11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)
Frankfurter Straße 110
64293
Darmstadt