Details

Forseen Maintenance

Unavailability Time Period: 23.12.2015 16:00 to 28.12.2015 08:30

Affected Market Area

10YDE-RWENET---I

Affected Capacity

Capacity Change (MW): 49

Gas Fired Power Station Darmstadt

11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)

Frankfurter Straße 110
64293 Darmstadt

Back to all Reports