Forseen Maintenance
Unavailability Time Period: 23.12.2015 16:00 to 28.12.2015 08:30
Affected Market Area
10YDE-RWENET---I
Affected Capacity
Capacity Change (MW): 49
Gas Fired Power Station Darmstadt
11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)
Frankfurter Straße 110
64293
Darmstadt