Details

Forseen Maintenance

Unavailability Time Period: 19.10.2015 16:00 to 13.11.2015 08:00

Affected Market Area

10YDE-RWENET---I

Affected Capacity

Capacity Change (MW): 49

Minute 1 961 1441 2401 2881 3841 4321 5281 5761 9661
MW 49 0 49 0 49 0 49 0 49 0
Minute 10141 11101 11581 12541 13021 13981 14461 15421 15901 19741
MW 49 0 49 0 49 0 49 0 49 0
Minute 20221 21181 21661 22621 23101 24061 24541 25501 25981 29821
MW 49 0 49 0 49 0 49 0 49 0
Minute 30301 31261 31741 32701 33181 34141 34621
MW 49 0 49 0 49 0 49

Gas Fired Power Station Darmstadt

11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)

Frankfurter Straße 110
64293 Darmstadt

Back to all Reports