Details

Forseen Maintenance

Unavailability Time Period: 01.10.2015 16:00 to 16.10.2015 08:00

Affected Market Area

10YDE-RWENET---I

Affected Capacity

Capacity Change (MW): 49

Minute 1 961 1441 5281 5761 6721 7201 8161 8641 9601
MW 49 0 49 0 49 0 49 0 49 0
Minute 10081 11041 11521 15361 15841 16801 17281 18241 18721 19681
MW 49 0 49 0 49 0 49 0 49 0
Minute 20161
MW 49

Gas Fired Power Station Darmstadt

11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)

Frankfurter Straße 110
64293 Darmstadt

Back to all Reports