Failure
Unavailability Time Period: 30.09.2015 13:15 to 01.10.2015 08:00
Affected Market Area
10YDE-RWENET---I
Affected Capacity
Capacity Change (MW): 46
Minute | 1 | 46 | 166 |
---|---|---|---|
MW | 46 | 0 | 49 |
Gas Fired Power Station Darmstadt
11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)
Frankfurter Straße 110
64293
Darmstadt