Failure
Unavailability Time Period: 06.07.2015 00:00 to 06.07.2015 08:00
Affected Market Area
10YDE-RWENET---I
Affected Capacity
Capacity Change (MW): 42.34
Minute | 1 | 61 | 121 | 181 | 241 | 301 | 361 | 421 |
---|---|---|---|---|---|---|---|---|
MW | 42.34 | 42.634 | 42.967 | 43.319 | 43.677 | 43.942 | 44.179 | 44.123 |
Gas Fired Power Station Darmstadt
11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)
Frankfurter Straße 110
64293
Darmstadt