Details

Forseen Maintenance

Unavailability Time Period: 11.04.2015 00:00 to 16.04.2015 00:00

Affected Market Area

10YDE-RWENET---I

Affected Capacity

Capacity Change (MW): 47

Gas Fired Power Station Darmstadt

11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)

Frankfurter Straße 110
64293 Darmstadt

Back to all Reports