Details

Failure

Unavailability Time Period: 23.12.2020 21:00 to 13.01.2021 00:00

Affected Market Area

10YDE-RWENET---I

Affected Capacity

Capacity Change (MW): 46

Gas Fired Power Station Darmstadt

11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)

Frankfurter Straße 110
64293 Darmstadt

Back to all Reports