Forseen Maintenance
Unavailability Time Period: 13.04.2018 00:00 to 18.04.2018 00:00
Affected Market Area
10YDE-RWENET---I
Affected Capacity
Capacity Change (MW): 49
Gas Fired Power Station Darmstadt
11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)
Frankfurter Straße 110
64293
Darmstadt