Details

Forseen Maintenance

Unavailability Time Period: 13.04.2018 00:00 to 18.04.2018 00:00

Affected Market Area

10YDE-RWENET---I

Affected Capacity

Capacity Change (MW): 49

Gas Fired Power Station Darmstadt

11WUA-DARMSTADTH
Gasturbinenkraftwerk Darmstadt (GTKW)

Frankfurter Straße 110
64293 Darmstadt

Back to all Reports